2019 EP&阿莱维

In February 2019, Seattle voters approved a three-year $815 mill离子 replacement levy. Local taxes collected from this levy provided the second largest source of SPS’s general fund operating budget.

大部分正规买足球的App的EP&O levy supports critical basic educat离子 programs which are not fully funded by the state. These include areas such as special educat离子 and bilingual educat离子 老师 and instruct离子al aides. Funding from the levy is also used for areas that would be considered enrichment, 比如安全和交通, 还有学生活动,比如体育运动, 戏剧, 学校里的音乐.

这项税收将于2022年到期.

2021-22年运营预算:按来源分列的资金

a circle chart shows various funding levels denotated by different colors: state funding is the largest with 59.8%,其次是地方税,15%2021-22年运营预算:按来源分列的资金

2016年BTA第四次资本征费

西雅图选民通过了六年475美元的计划.3 mill离子 Buildings, 技术, and 学者/Athletics IV Capital Levy (BTA IV) in February 2016. 它取代了 BTA 三、征费. BTA IV projects are on schedule and within the program budget as of November 30, 2021. 这项税收将于2022年到期. Projects selected were primarily based on school condit离子 and capacity needs and followed the School Board’s Guiding Principles for BTA IV. 了解更多关于BTA IV.

街角的砖房. 它坐落在一座小山上,周围有花园,一条人行道经过白玉兰小学,摄影:Benschneider Photography

建筑

Promised: Renovate and open three vacant school buildings as elementary schools to increase capacity for students and build an addit离子 at one high school.

交付

  • E装修开业.C. 休斯将成为罗克斯希尔小学(2018年), 白玉兰小学成为2019年新入学地区学校, 和韦伯斯特学校招收利顿泉K-8(2021年).
  • 增建在英格拉姆高中,于2019年开放

承诺:提高两栋建筑的抗震安全,保护学生, 教师及职员, 以及建筑的完整性.

交付

  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工.

承诺:安装灭火/洒水系统

交付/进展

  • 林肯高中,2019年完工
  • 白玉兰小学,2019年完工
  • 丹尼尔·巴格利小学,2020年完工
  • 韦伯斯特学校(Licton弹簧 K-8),于2021年完工
  • 北安妮女王(喀斯喀特家长合伙公司),正在进行中

承诺:火灾报警系统改进

交付/计划

  • 米尼中学,2017年完工
  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工.
  • 约翰·缪尔小学,计划于2022年开学

承诺:安全改进-建筑物(门窗警报)

交付/计划

  • 阿基Kurose中学,2018年完工
  • 雷尼尔海滩高中,2018年完工
  • 迪尔伯恩公园小学,2021年完工
  • 约翰·缪尔小学,2021年完工
  • 惠特沃斯(虎鲸K-8),计划2022年

承诺:更换对讲系统

交付/计划

  • 米尼中学,2017年完工
  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工
  • 约翰·缪尔小学,计划于2022年开学

Promised: Replace all or port离子s of roofs and make roof improvements that increase earthquake safety

交付

  • 迪尔伯恩公园小学,2018年完工
  • 巴拉德高中,2018年完工
  • 林肯高中,2019年完工
  • 英格拉姆高中,2019年完工
  • 加菲猫高中,2018年完工
  • 西西雅图高中,2021年完工

Promised: Exterior Renovat离子s/Improvements (Doors, windows, exterior walls)

一座高大的砖砌建筑有白色的柱子和拱形的窗户富兰克林高中的窗户更换项目

交付/进步/计划

  • 盖特伍德小学,外部覆层,2018年完成
  • 洛厄尔小学,门,2018年完工
  • Sanislo小学,门,2018年完工
  • 丹尼尔·巴格利小学,门窗,2019年完工
  • 林肯高中,门,2019年完工
  • 富兰克林高中,窗户、门和包层,2020年完工
  • 加菲猫高中,门,2021年完工
  • 韦奇伍德小学,门,完成2021年
  • 巴拉德高中,外墙覆层正在施工中
  • North 安妮女王 School (层叠父母合伙), windows and doors, in progress
  • Eckstein中学,外墙覆层,计划2022年
  • 格雷厄姆·希尔小学,2022年开学
  • 惠特沃斯(虎鲸 K-8),门,计划2022年

Promised: Heating, Ventilat离子, and Air Condit离子ing (HVAC) System Improvements

交付/计划

  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工
  • 盖特伍德小学,计划于2022年开学

承诺:电气系统改进

交付/进步/计划

  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工
  • 北安妮女王学校(Cascade家长合作),正在进行中
  • 富兰克林高中体育馆,预定,2022年夏天

承诺:管道系统改进

交付

  • 林肯高中,2019年完工
  • 丹尼尔·巴格利小学,2020年完工

承诺:全区支援计划 日常更换餐饮设备, 餐厅, 维护, 理由, and 安全; planning and elect离子 costs for 2019 elect离子.

交付

  • All funding spent or reserved for specific line items and not used for other projects.

承诺:物业收购

交付

  • 加入可用于购置物业的资金. Having this budget available reduces the lead time for SPS to acquire property if need and opportunity arises, and it reduces the potential need to take on debt to finance property addit离子s.

承诺:重大预防性维护

交付

  • 这笔资金继续为预防性维护项目提供资金.

承诺:资本合格贷款偿还

交付

  • 这笔资金已经并且只能用于指定的目的.

承诺:偿还债务

交付

  • This funding pays the debt incurred in purchasing and renovating the 约翰·斯坦福卓越教育中心.

技术

Promised: Make strategic investments in technology to support teaching and learning in the 教室; delivery of services to students, 老师, 工作人员, and families; and improve business efficiency.

已交付/正在进行中:见 技术 下面

学者/体育

承诺:特殊教育项目修改

交付

  • These funds have been used to modify buildings and systems to meet changing needs of students receiving special educat离子 services.

Promised: Science and computer labs at high schools as needed to support CORE 24 graduat离子 requirements

交付/计划

  • 这些资金已经并将用于指定的目的.

承诺:学生评估系统许可

交付

  • 已支付的许可证费用

承诺:项目安置

交付

  • These funds have been and will be used to support changes to school buildings and portable placement to meet the changing needs in placement of educat离子 programs around the district. They are also used for capital-eligible new program and curriculum materials.

Promised: Athletic Field Improvements and Exterior Lights, Defibrillators

简·亚当斯中学的田径比赛- 2020年

交付

  • 罗伯特·伊格尔手杖 中学, field upgrades completed 2017, and lighting completed 2019
  • Chief Sealth高中,场地升级于2018年完成
  • 加菲猫高中,场地升级于2019年完成
  • 内森黑尔高中,场地升级于2020年完成
  • 简亚当斯中学,场地升级于2020年完成
  • 英格拉姆高中,场地升级,计划2022年
  • Lower Woodland, fields and lights, canceled – funding to be reprogrammed to other capital projects.
  • 除颤器,2018-2022年全区更换电池

2019 卓越建筑及基建征款(咳嗽 V)

一台起重机将结构钢吊装到位Structural steel for the new school building at 詹姆斯鲍德温小学 – Dec. 2021

西雅图选民于2019年2月批准了咳嗽 V. 这个6年期,1美元.40亿元的资本征款取代即将到期的咳嗽 IV征款. 咳嗽 V provides funding for replacement or major modernizat离子 of aging school buildings, 还有额外的安全性, 安全, 基础设施项目. 它将于2025年到期. Projects selected went through an extensive community vetting process and followed the School Board’s Guiding Principles for 咳嗽 V. 了解更多关于咳嗽 V.

Promised: Replacement of 7 aging school buildings — 乙醇 小学 School, 约翰罗杰斯小学, 金博尔小学, 詹姆斯鲍德温小学, 和Viewlands小学, 美世国际中学, 和雷尼尔海滩高中

  • Under construct离子: 金博, 詹姆斯·鲍德温, and Viewlands replacement schools
  • 规划:乙醇, 约翰·罗杰斯, Mercer和雷尼尔山海滩

Promised: Major modernizat离子 and expans离子 of the landmarked Montlake 小学 School

  • 在规划

Promised: Classroom addit离子 and improvements at 西西雅图 小学 School and 西方国家森林 小学 School

  • 交付:西方国家森林于2021年完工
  • 西西雅图正在建设中

承诺:Van Asselt学校临时场地

  • 在规划

Beyond the promise: Classroom addit离子 construct离子 projects in progress that include 咳嗽 V funding added to Distressed 学校 Grants from the State of 华盛顿

  • 在建:Leschi小学,麦迪逊中学

Promised: School building systems projects including safety and 安全 upgrades, 采暖通风系统改善, 电气及水管工程, and athletic fields and playground improvements have been completed or are scheduled in upcoming years.

有关当前项目的更多信息

技术

Both the BTA and 咳嗽 capital levies provide more than 85% of funding for technology 工作人员, 设备, 和服务. The COVID 19 pandemic led to accelerat离子 of some projects and re-prioritizing others to support the rapid move to online learning.

在过去六年,卫生及卫生局:

  • 扩大学生, 老师, 教室, 区域技术设备, 人员配备, 和服务 to ensure that every student had laptops and internet access for online line learning during the pandemic.
  • Implemented a digital equity program to support schools and students who are historically underserved.
  • Enhanced cyber安全 for better protect离子 of students, 工作人员, and district resources.