项目

北门(现鲍德温)

Northgate 小学 School Replacement Project

School renamed 詹姆斯·鲍德温 小学 School

现有的学校建筑已经在同一地点被一座新的学校建筑所取代.

詹姆斯鲍德温小学于2023年9月6日对学生开放.

请注意

西雅图公用事业公司将沿着詹姆斯鲍德温小学周围的西北120街和西北117街建设自然排水系统(NDS).

如果您对这项工作有任何疑问,请联系西雅图公用事业公司. More information is available on the 城市的网站.

开业庆典

8月9日,新学校举行了剪彩仪式. 31, 2023. 读故事.

Photos from the event are below.

a person with a feather headdress, 串珠袖口, 一条带牙齿的项链在它们的脸前面有一个巨大的粉红色贝壳
Shell sounding during blessing ceremony
一个本地风格的鸟标志
New 詹姆斯·鲍德温 小学 School logo
a person with a feather headdress holds a pot up
Incense used during the blessing ceremony
一个男人站在讲台上,背景是一座浅色的砖房
主管琼斯
a group of people are looking down at a red ribbon. one person has giant scissors. the others have normal size scissors. all have the ribbon between the scissor blads
在彩带前排队
白砖建筑的左边是一层,右边是两层. the building has orange trim. a curved grass area is in the foreground
Closer view of the new entry
一群人手持剪刀和红丝带面向一个方向
彩带剪好了
a woman stands at a podium with a microphone attached. 她身后是一堵浅色的砖墙和一扇橙色边框的窗户
妮可·西尔弗校长
a woman stands at a podium with microphones attached. 她身后是一堵浅色的砖墙和一扇橙色边框的窗户
Dr. 戴迪·方特勒罗伊,北门小学前校长
白砖建筑的左边是一层,右边是两层. the building has orange trim. a circular plaza is in front surrounded by grass
New 詹姆斯·鲍德温 小学 School
people in native dress dance in front of a 1 story building
Anáhuac Blessing Dance performed by Tlalokan

最近的进展

Progress updates are posted for the previous month

Major activity in January 2024

  • Continued play yard traffic garden striping.
  • 完成下层游戏场地的游戏结构安装, PreK的游乐设备计划在冬中假期的那一周安装.

Major activity planned for February 2024

  • Complete PreK play structure installation.
  • 完成调试.
  • Complete play yard traffic garden stripping.

项目的照片

an I-beam painted white with signatures
北门小学的学生们在新学校的横梁上签名. 2021
楼梯间的墙上嵌有一根钢梁
在施工早期由学生签名的横梁现在位于楼梯上- 2月. 2023
a sliding glass interior door
Interior sliding doors installed in classroom – Jan. 2023
管状顶灯悬挂在高高的天花板上,下面有一个楼梯
Entry lights installed – Feb. 2023
楼梯:中间有一个可作直角转弯的平台的楼梯
西楼梯视野- 2月. 2023
教室的墙壁部分在橱柜下面有一个角落,其中包括两个面向的长凳,它们之间有一个突出的壁架. next to them is open shelving below a window. Both areas are highlighted by bright green accents
Cozy nook and shelving in art classroom – March 2023
管状灯具悬挂在带有楼梯的两层空间的高天花板上
Lighting installed – April 2023
向下看一个大的空间,有一个步行的楼梯,一个坐下的楼梯,还有一个滑梯
Learning stairs and slide in the commons – April 2023
A curved three tier bench in a the corner of a room
Group learning area in library – April 2023
一面带窗户的弧形墙在窗户下面有书架
Casework in the library – April 2023
一栋两层楼建筑的一部分,有木边和窗户的天篷. a sign on the building says 詹姆斯·鲍德温 小学
Entrance to new building with new school name – May 2023
室内楼梯从混凝土地板向上延伸,经过一组窗户. there is a slide next to the stairs
通往空间入口的公共楼梯- 2023年5月
interior space with a reception desk. wall behind says 詹姆斯·鲍德温 小学
Welcoming reception area – June 2023
view from halfway up stairs on a landing. 你可以看到二楼的一部分有弧形玻璃墙,还有下层的一部分.
Central gathering area near the main entrance – June 2023
航拍的大型建筑物的照片,建筑物顶部有一条道路,道路两旁有树木
鸟瞰图- 2023年8月
室内空间,有石板天花板,桌子,凳子,柜台和水槽. it is separated from the hall by a partial wall
Learning commons with furniture installed
part of a hallway with doors set back from the path by tile. a sink hangs on the wall at one end
Student restrooms and handwashing – June 2023
一个有两台冰箱、橱柜、一个炉子、两台微波炉和一些桌椅的房间
Completed staff lounge – June 2023
走廊的一部分,一边靠窗有木凳,另一边有弯曲的角落
Central hallway – June 2023
望向通往窗户前的楼梯,楼梯下面有一个木制平台
Stairway to second floor – June 2023
教室里有几组带椅子的桌子、书柜、白板、灯光和吊扇
Classroom with furniture installed – June 2023
一个小房间,有一个电视屏幕,一面墙上有窗户,一张半圆形的桌子和五张凳子
Small group space with furniture installed – June 2023
outdoor looking toward a long low building with a stairway, 具体走, and construction materials in front of it
旧北门小学建筑的拆除将于2023年7月至6月开始
从人行道上看向一层和两层的建筑,入口有顶棚,窗框是橙色和绿色的
2023年8月,新詹姆斯·鲍德温小学的正门
一个停车场,旁边是一栋有橙色窗框的单层建筑
New staff parking lot – August 2023
an excavator is demolishing a building
拆除老北门小学大楼- 2023年7月
一座白色屋顶的大型建筑的鸟瞰图,后面是建筑区域. the freeway can be seen in the background
新楼鸟瞰图,旧楼已拆除- 2023年8月
aerial view of a construction area next to a new building
2023年8月,老学校已经被拆除,室外游乐区的工作已经开始
high angle view of a large building and trees
9月,学校建筑完工,操场和操场正在建设中. 2023
鸟瞰图,一座大型建筑物和铺砌区域,下部正在进行一些建筑工作
Aerial view looking north – Oct. 2023
这是一座大型建筑的鸟瞰图,左边是一片土地,前面是停车场
View of the school with the future field to the left – Nov. 2023
people installing a play structure with equipment
Installing the play structures – Nov. 2023
a paved area with striping painted on it
Traffic garden striping – Dec. 2023
a green grass playfield with a 具体走way
场地草皮安装- 12月. 2023

项目简介

新的两层小学建筑将为学生提供学业成功所需的空间和资源. 大约95,000平方英尺的学校将满足该地区的基础教育要求,并为多达650名学生提供空间. 一个合作的过程产生了一个适合社区的建筑. It will provide outdoor learning, play, and recreation areas.

The new school has been designed to provide an equitable, 安全, 为整个学校社区提供了一个鼓舞人心的学习环境. 学习集群将有围绕学习公地的教室.

Sustainable Design and Construction

In keeping with SPS’s clean energy goals, 新学校的运作将不需要任何化石燃料. 除了, the roof is designed to accommodate solar panels, 哪一种可以抵消未来建筑80%的能源消耗.

Features to reduce energy use:

  • 地热供暖系统
  • 高效通风,在空气离开学校之前回收热量
  • Energy-efficient LED lighting
  • Highly insulated walls and roofs
  • High performance fiberglass windows

Other sustainable design strategies:

  • Storm water management with rain gardens
  • Native and drought-resistant plantings
  • Shielded site lighting to reduce light pollution
  • Demolition and construction debris sorted and recycled

Projected Energy Use Index (EUI): 17.3

设计公司: 南京汽车架构

General Contractor/Construction Management: 此施工

项目预算: $90.3M

资金来源: 由卓越建筑V (BEX V)资本税资助,于2019年由西雅图选民批准.

School Design Advisory Team: Learn about the School Design Advisory Team (SDAT) process  阅读会议记录.

正规买足球的App

Let’s Talk for Project Questions

项目经理: 阿曼达Fulford) asfulford1@elahomecollection.com, 206-252-0697

詹姆斯·鲍德温 小学 School

11725 1st Ave NE
西雅图,华盛顿州98125

学校简介

学校的网站